Panera Bread Cafe at Punta Gorda Station
Sector: Power Generation (CCGT) • Location: Punta Gorda, Florida, United States of America
Source: Dodge
Interior Fitout of Existing Shell - - Project Scope: 2,400 SF Div. 3 Concrete slab Div. 5 Steel: Miscellaneous Div. 6 Carpentry, Rough & Finish, Furniture and Millwork install Div. 8 Doors, Frames, Hardware Div. 9 Interior Framing, Blocking, Plywood, Drywall, FRP, Painting, Wallpaper, ACT, Tile, Flooring Div. 10 Toilet Accessories, SS Panels, Corner guards Div. 15 Plumbing, HVAC (Hoods, Duct, E Fa
- Status
- Closed
- Sector
- Power Generation (CCGT), Consumer Products, Raw Materials, Cement, Commercial, Steel, Metal
- Location
- Punta Gorda, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Panera Bread Cafe at Punta Gorda Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior Fitout of Existing Shell - - Project Scope: 2,400 SF Div. 3 Concrete slab Div. 5 Steel: Miscellaneous Div. 6 Carpentry, Rough & Finish, Furniture and Millwork install Div. 8 Doors, Frames, Hardware Div. 9 Interior Framing, Blocking, Plywood, Drywall, FRP, Painting, Wallpaper, ACT, Tile, Flooring Div. 10 Toilet Accessories, SS Panels, Corner guards Div. 15 Plumbing, HVAC (Hoods, Duct, E Fans) Div. 16 Electrical |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Punta Gorda |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Consumer Products, Raw Materials, Cement, Commercial, Steel, Metal |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
