Panglima Power, Teluk Gong 2

Sector: Commercial • Location: Malaysia

Source: World Bank Group

Project
Cancelled

In July 2000 Panglima Power Sdn Bhd began gained approval for a 720 MW gas-fired plant at Teluk Gong, Malacca State. The plant (TGPS2) was to be initially constructed as an open cycle power plant with a capacity of 460 MW, to then be converted to a combined cycle plant with a capacity of 720 MW. Panglima Power was to sell power to Tenaga Nasional under a 21-year power purchase agreement signed i

Project Information FAQ

Project Information

5 Q
The project “Panglima Power, Teluk Gong 2” is an infrastructure initiative in the Commercial sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July 2000 Panglima Power Sdn Bhd began gained approval for a 720 MW gas-fired plant at Teluk Gong, Malacca State. The plant (TGPS2) was to be initially constructed as an open cycle power plant with a capacity of 460 MW, to then be converted to a combined cycle plant with a capacity of 720 MW. Panglima Power was to sell power to Tenaga Nasional under a 21-year power purchase agreement signed in July 2001 for US$ 3.09 cents per kWh. Panglima Power was a wholly owned subsidiary of Powertek Sdn Bhd, which was created in 1993 to construct the initial TGPS1 power plant at Teluk Gong. Powertek Sdn Bhd was initially owned by the Melaka state government (14.83%), Cergas Unggul Sdn Bhd (25.96%), Arab Malaysian Development Berhad (22.5%) and IVO Group (7.42%, Finland). Powertek was listed on the Main Board of the Bursa Malaysia Securities Berhad in 1996, but on 30 April 2003 Powertek became a wholly-owned subsidiary of Tanjong Energy Holdings Sdn Bhd (TEH) and was taken private. TEH was a wholly-owned subsidiary of Tanjong public limited company, incorporated in England and listed on both the Bursa Malaysia Securities Berhad and the London Stock Exchange. Financial closure for the initial open cycle phase was reached in 2001, while final closure for the combined cycle phase was reached on January 20 2003. The total cost for the project was expected to be US$500 million. Powertek raised RM350 million (US$92 million) through issuance of bonds and RM250 million (US$66 million) through commercial paper/medium term notes. In February 2003, Panglima Power signed a RM84 milion three-year standby loan from Arab Malaysian Merchant Bank, Aseam Bankers, CIMB, EON Bank, and UOB. The bonds are part of an overall debt issue comprising RM1,220 million worth of debentures to fund the conversion of its second phase. Construction commenced in December 2000, and was undertaken by Siemens AG. Commercial operation began in February 2002 with an initial generation capacity of 230MW followed by another 230 MW a month later, with the full combined cycle 720 MW operation commencing in March 2003. On March 2nd 2012, 1Malaysia Development Berhad (1MDB) acquired Tanjong Energy Holdings Sdn Bhd (TEHSB) for RM8.5 billion (US$2,820 million). Tanjong Energy owns equity in 13 IPPs internationally. Tanjong Energy fully acquired Poertek Berhad in April 2003. http://www.powertek.com.my/powertek/tgps2.asp http://www.1mdb.com.my/news-1/1mdb-seals-tanjong-energy-deal http://www.reuters.com/article/2012/03/07/1malaysia-tanjong-idUSL4E8E73OX20120307

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data