logo

Panguil Bay Bridge O&M Project in Philippines

Sector: Road • Location: Lanao del Norte - Misamis Occidental - Tangub, Philippines

Source: InfraPPPWorld

Project
Project In Tender

The Project involves the management, improvement, operation, and maintenance of the Panguil Bay Bridge (PBB), a two-way, two-lane 3.17-km bridge (consisting of a 2.24 km bridge and 0.929 km approach road component) which is a sea crossing bridge located in Panguil Bay, Northern Mindanao (Region X) that connects Tangub City in Misamis Occidental and the Municipality of Tubod in Lanao del Norte, Phi

Project Information FAQ

Project Information

4 Q
The project “Panguil Bay Bridge O&M Project in Philippines” is an infrastructure initiative in the Road sector, located in Lanao del Norte - Misamis Occidental - Tangub, Philippines. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves the management, improvement, operation, and maintenance of the Panguil Bay Bridge (PBB), a two-way, two-lane 3.17-km bridge (consisting of a 2.24 km bridge and 0.929 km approach road component) which is a sea crossing bridge located in Panguil Bay, Northern Mindanao (Region X) that connects Tangub City in Misamis Occidental and the Municipality of Tubod in Lanao del Norte, Philippines.This project is Mindanao’s longest sea-crossing bridge, with the total investment cost funded through an Official Development Assistance(ODA) loan with the Korean Export-Import Bank - Economic Development Cooperation Fund (KEDCF). The bridge construction started on February 28, 2020, and was inaugurated on September 27, 2024. With the construction of PBB, travel time between Tubod and Tangub is significantly reduced from 1.5 to 2 hours to approximately 7-10 minutes. The PBB is expected to catalyze economic growth in Northern Mindanao. Farmers and traders now have a reliable means to transport goods, significantly reducing costs and increasing efficiency.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data