Panhandle Social Distancing and Safety Project
Sector: Car parking • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Panhandle Social Distancing and Safety Project Share this: Facebook Twitter LinkedIn Project Introduction Click here for the latest construction update. The SFMTA is proposing a parking protected bikeway on Fell Street between Baker Street and Shrader Street to provide relief to crowding and support social distancing on the Panhandle Path. This temporary project is being proposed as an emergency r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Panhandle Social Distancing and Safety Project Share this: Facebook Twitter LinkedIn Project Introduction Click here for the latest construction update. The SFMTA is proposing a parking protected bikeway on Fell Street between Baker Street and Shrader Street to provide relief to crowding and support social distancing on the Panhandle Path. This temporary project is being proposed as an emergency response to COVID-19. Project Status Completed Improvements Protected Bikeways Parking and Curb Management Changes Neighborhoods Haight Ashbury Project Overview Within the project limits, Fell Street is one-way westbound with four travel lanes and unmetered parking on both sides of the street. The proposed improvements involve repurposing a travel lane in order to fit a parking protected westbound bikeway on the south side of Fell Street. The protected bikeway will be located curbside, with a three-foot access aisle to access the floating parking. The cross sections below detail the existing and proposed conditions for the corridor. Existing Proposed A signal protected intersection design at Masonic was considered but a mixing zone treatment was chosen because: New curbside bikeway with signal separation would result in signal heads out of alignment with bikeway and lanes, potentially resulting in confusion and red light running A signal modification and changes to the red light camera would be required and would delay the project, substantially if signal modifications could not be made using existing hardware A fully protected option is available along the path As a result of this project, approximately 12 out of 136 parking spaces on the south side of Fell Street will be removed in order to provide space for turning lanes and visibility zones. To view the latest draft of the proposed conceptual design, please follow this link . Construction This parking protected bikeway will be paint and safe-hit post construction only. Any construction related lane closures will have little to no effect on transit, pedestrians, and bicyclists. Project construction will be carried out by SFMTA Shops and will not require coordination with other agencies. Construction is expected to begin on Monday, July 20, 2020 and parking will be temporarily unavailable during the three week construction period. Contact Information Mike Sallaberry Mike.Sallaberry@sfmta.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
