logo

Panshan Tunnel and connections in Southern New District to Lingang Expressway

Sector: Automotive • Location: China

Source: World Bank Group

Project
Active

The project starts from Yanli Road, the south bank of Yanpingba Yangtze River Bridge in the north, and has Yichang Road in the south. It is about 5.01 kilometers long (including the main line is about 3.53 kilometers long and the road length is about 1.48 kilometers). It includes the Yingying Panshan Tunnel, the Chengnan Interchange and the connecting line. The road grade is Grade I Highway. It is

Project Information FAQ

Project Information

5 Q
The project “Panshan Tunnel and connections in Southern New District to Lingang Expressway” is an infrastructure initiative in the Automotive sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project starts from Yanli Road, the south bank of Yanpingba Yangtze River Bridge in the north, and has Yichang Road in the south. It is about 5.01 kilometers long (including the main line is about 3.53 kilometers long and the road length is about 1.48 kilometers). It includes the Yingying Panshan Tunnel, the Chengnan Interchange and the connecting line. The road grade is Grade I Highway. It is designed according to two-way six lanes. There is no motor vehicle lane and sidewalk. The design speed is 80km/h. There are two types of subgrade, the overall subgrade is 31.5m wide, the separated subgrade is 15.75m wide; the Yingpanshan tunnel is a double-hole tunnel, the left tunnel is 1361m long, the right tunnel is 1374m long, and the single-section standard section is 13.75m wide; The Chengnan Interchange has main line bridges and ramps. The main line bridges are set in width. The standard section of the left line bridge is 15.75m wide and the standard section of the right line bridge is 19.5m wide. The ramps are divided into two categories, designed according to single lane or 2 lanes. The designed speed is 40km/ h. Total project cost is $ 220.99 million. The BOT concession has a duration of 15 years. Financial close took place on August 2, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=db53fcb542574d23b82dc15896525ad8

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data