logo

Panshan Tunnel and connections in Southern New District to Lingang Expressway

Sector: Automotive • Location: China

Source: World Bank Group

Project
Active

The project starts from Yanli Road, the south bank of Yanpingba Yangtze River Bridge in the north, and has Yichang Road in the south. It is about 5.01 kilometers long (including the main line is about 3.53 kilometers long and the road length is about 1.48 kilometers). It includes the Yingying Panshan Tunnel, the Chengnan Interchange and the connecting line. The road grade is Grade I Highway. It is

Status
Prospective
Sector
Automotive, Bridge, Car parking, Road, Tunnel, Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Panshan Tunnel and connections in Southern New District to Lingang Expressway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Panshan Tunnel and connections in Southern New District to Lingang Expressway” is an infrastructure initiative in the Automotive sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project starts from Yanli Road, the south bank of Yanpingba Yangtze River Bridge in the north, and has Yichang Road in the south. It is about 5.01 kilometers long (including the main line is about 3.53 kilometers long and the road length is about 1.48 kilometers). It includes the Yingying Panshan Tunnel, the Chengnan Interchange and the connecting line. The road grade is Grade I Highway. It is designed according to two-way six lanes. There is no motor vehicle lane and sidewalk. The design speed is 80km/h. There are two types of subgrade, the overall subgrade is 31.5m wide, the separated subgrade is 15.75m wide; the Yingpanshan tunnel is a double-hole tunnel, the left tunnel is 1361m long, the right tunnel is 1374m long, and the single-section standard section is 13.75m wide; The Chengnan Interchange has main line bridges and ramps. The main line bridges are set in width. The standard section of the left line bridge is 15.75m wide and the standard section of the right line bridge is 19.5m wide. The ramps are divided into two categories, designed according to single lane or 2 lanes. The designed speed is 40km/ h. Total project cost is $ 220.99 million. The BOT concession has a duration of 15 years. Financial close took place on August 2, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=db53fcb542574d23b82dc15896525ad8

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Car parking, Road, Tunnel, Government, Commercial

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project