Panshan Tunnel and connections in Southern New District to Lingang Expressway
Sector: Automotive • Location: China
Source: World Bank Group
The project starts from Yanli Road, the south bank of Yanpingba Yangtze River Bridge in the north, and has Yichang Road in the south. It is about 5.01 kilometers long (including the main line is about 3.53 kilometers long and the road length is about 1.48 kilometers). It includes the Yingying Panshan Tunnel, the Chengnan Interchange and the connecting line. The road grade is Grade I Highway. It is
- Status
- Prospective
- Sector
- Automotive, Bridge, Car parking, Road, Tunnel, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Panshan Tunnel and connections in Southern New District to Lingang Expressway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project starts from Yanli Road, the south bank of Yanpingba Yangtze River Bridge in the north, and has Yichang Road in the south. It is about 5.01 kilometers long (including the main line is about 3.53 kilometers long and the road length is about 1.48 kilometers). It includes the Yingying Panshan Tunnel, the Chengnan Interchange and the connecting line. The road grade is Grade I Highway. It is designed according to two-way six lanes. There is no motor vehicle lane and sidewalk. The design speed is 80km/h. There are two types of subgrade, the overall subgrade is 31.5m wide, the separated subgrade is 15.75m wide; the Yingpanshan tunnel is a double-hole tunnel, the left tunnel is 1361m long, the right tunnel is 1374m long, and the single-section standard section is 13.75m wide; The Chengnan Interchange has main line bridges and ramps. The main line bridges are set in width. The standard section of the left line bridge is 15.75m wide and the standard section of the right line bridge is 19.5m wide. The ramps are divided into two categories, designed according to single lane or 2 lanes. The designed speed is 40km/ h. Total project cost is $ 220.99 million. The BOT concession has a duration of 15 years. Financial close took place on August 2, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=db53fcb542574d23b82dc15896525ad8 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Bridge, Car parking, Road, Tunnel, Government, Commercial |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in China
- Yangcheng CoalFired Power Plant Shanxi Province
- Jiangan County Biomass Power Plant Project
- Wuyi County Solid Waste Incineration Power Plant
- Dongming County Highway
- Ji'an City urbanization project
- Maigaiti County Zhengxin 20MW PV Power Plant
- Wencheng Waste-to-Energy Plant
- Tonglu County Solid Waste Incineration Power Plant
