Pantabangan - Masiway Hydroelectric Power Plant
Active · Nueva Ecija
Source: World Bank Group
In September 2006, Government of Philippine's Power Sector Assets and Liabilities Management Corporation (PSALM) declared First Generation Hydropower Corporation (FGHPC) as the winning bidder for the 112-megawatt (MW) Pantabangan-Masiway Hydroelectric Power Plant Complex. The two plants are located in Nueva Ecija, and were previously owned by National Power Corp. (Napocor). FGHPC, as the new owner
- Status
- Prospective
- Sector
- Cable car, Government, Hydro, Power Generation (CCGT), Automotive, Telecommunications
- Location
- Nueva Ecija, Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pantabangan - Masiway Hydroelectric Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2006, Government of Philippine's Power Sector Assets and Liabilities Management Corporation (PSALM) declared First Generation Hydropower Corporation (FGHPC) as the winning bidder for the 112-megawatt (MW) Pantabangan-Masiway Hydroelectric Power Plant Complex. The two plants are located in Nueva Ecija, and were previously owned by National Power Corp. (Napocor). FGHPC, as the new owner, was to sell the electricity produced at the complex into the wholesale electricity spot market (WESM). FGHCPC won the project through a competitive tender by bidding US$129 million which topped SN Aboitiz Power Inc.’s offer of US$ 112 million. As of Dec. 31, 2008, FGHCPC was owned by First Gen Corporation (40%) and Energy Development Corporation (EDC) (60%). Given that First Gen was 55% owned by First Philippine Holdings Corporation, while EDC was 40% owned by First Gen through First Gen's wholly owned subsidiary, Red Vuclan Holdings, First Philippine Holdings Corporation was the largest single shareholder in FGHCPC, with a 35% economic interest. The financial closure date was on November 16, 2006 when PSALM submitted the closing documents for the privatization of the abovementioned plant to FGHPC. At the same time, in compliance to Asset Purchase Agreement (APA), FGHPC delivered its Certificate of Closing and documentary deliverables, and posted a performance bond of US$2.58 million, which is equivalent to 2% of the purchase price to complete the transaction. The operational turnover of the plant was held on Friday, 17 November 2006. |
Original sector | Energy |
Budget |
Location
Country | Philippines |
State | Nueva Ecija |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Cable car, Government, Hydro, Power Generation (CCGT), Automotive, Telecommunications |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
