logo

Pantabangan Reservoir in Nueva Ecija

Sector: Water Supply and Storage • Location: Nueva Ecija, Philippines

Source: InfraPPPWorld

Project
Project In Planning

The project involves the development of the Pantabangan Reservoir, an earth-fill embankment dam on the Pampanga River located in Pantabangan in the Province of Nueva Ecija, Philippines.The dam is a 107 m tall and 1,615 m long embankment-type with 12,000,000 cu yd (9,174,658 m3) of homogeneous earth-fill and an impervious core. The dam's reservoir has a gross capacity of 2,996,000,000 m3 (2,428,897

Project Information FAQ

Project Information

4 Q
The project “Pantabangan Reservoir in Nueva Ecija” is an infrastructure initiative in the Water Supply and Storage sector, located in Nueva Ecija, Philippines. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development of the Pantabangan Reservoir, an earth-fill embankment dam on the Pampanga River located in Pantabangan in the Province of Nueva Ecija, Philippines.The dam is a 107 m tall and 1,615 m long embankment-type with 12,000,000 cu yd (9,174,658 m3) of homogeneous earth-fill and an impervious core. The dam's reservoir has a gross capacity of 2,996,000,000 m3 (2,428,897 acre·ft) and 2,083,000,000 m3 (1,688,716 acre·ft) of that volume is active (or useful) for irrigation and power. The dam sits at the head of an 853 km2 catchment area and its reservoir has a surface area of 69.62 km2 and elevation of 230 m when at its maximum level. The powerhouse is located at the base of the main dam and contains two 50 MW Francis turbine-generators for an installed capacity of 100 MW. Each turbine receives water via a 6 m diameter penstock. When the water is discharged, it is released into a 250 m-long tailrace channel where it re-enters the river.The multi-purpose dam provides water for irrigation and hydroelectric power generation while its reservoir, Pantabangan Lake, affords flood control. The reservoir is considered one of the largest in Southeast Asia and also one of the cleanest in the Philippines. Construction on the dam began in 1971 and it was completed in 1977.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data