Pantanal Transmissao

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

In July 2013, Consorcio Pantanal, a partnership of Cel Engenharia LTDA (51%) and the state-owned company Celg Geração e Transmissao S.A (49%), was awarded the contract to build and operate the Campo Grande II subestation (230/138 kV) located in the municipality of Campo Grande, state of Mato Grosso.

Besides Consorcio Pantanal, only another bidder took part in the contest: Cobra Instalaciones Y Se

Status
Prospective
Sector
Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pantanal Transmissao

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pantanal Transmissao” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In July 2013, Consorcio Pantanal, a partnership of Cel Engenharia LTDA (51%) and the state-owned company Celg Geração e Transmissao S.A (49%), was awarded the contract to build and operate the Campo Grande II subestation (230/138 kV) located in the municipality of Campo Grande, state of Mato Grosso. Besides Consorcio Pantanal, only another bidder took part in the contest: Cobra Instalaciones Y Sevicios. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Pantanal presented the lowest offer, a total value of US$ 1.2 million (BRL 4.3 million), 5% below the ceiling set by the regulatory agency. The contract was signed in October 2013, and the sponsors created the company Pantanal Transmissao S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 13.6 million (BRL 50.3 million) in the project. The construction works started in January 2016 and were concluded in June 2016. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project