logo
ProjectPlanning Schematics

Pantheon Solar 2 - 200 MW

Sector: Power Generation (CCGT) • Location: Ely, Nevada, United States of America

Source: Dodge

Up to 200 MW solar facility with 230kV or 500kV generation-tie line located on approximately 1,293 acres of federally-managed land in White Pine County

Status
Prospective
Sector
Power Generation (CCGT), Solar, Power Transmission, Commercial
Location
Ely, Nevada, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pantheon Solar 2 - 200 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pantheon Solar 2 - 200 MW” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ely, Nevada, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Up to 200 MW solar facility with 230kV or 500kV generation-tie line located on approximately 1,293 acres of federally-managed land in White Pine County

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Ely

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Power Transmission, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project