logo
ProjectPlanned

Pantheon Supercomputer Project

Planned · Sisak-Moslavina County · Last reported Jan 2027

Source: Vreme

The Pantheon project is a state-of-the-art supercomputer center planned to be built in the municipality of Topusko in Sisak-Moslavina County, Croatia. It will include advanced power systems, its own water sources and cooling system solutions, and a complex network of transmission lines and roads. The center will have a total power of one gigawatt and will meet the highest Tier four standard in the

Status
Prospective
Sector
Power Generation (CCGT), Solar, Water Supply and Storage, Data Center, Road
Location
Topusko, Sisak-Moslavina County, Croatia
Updated
22 Jul 2026
Source
Vreme

ConstructChat

Ask ConstructChat about Pantheon Supercomputer Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pantheon Supercomputer Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Topusko, Sisak-Moslavina County, Croatia. Taiyo aggregates data on it from Vreme.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Pantheon project is a state-of-the-art supercomputer center planned to be built in the municipality of Topusko in Sisak-Moslavina County, Croatia. It will include advanced power systems, its own water sources and cooling system solutions, and a complex network of transmission lines and roads. The center will have a total power of one gigawatt and will meet the highest Tier four standard in the EU. It will feature its own substation and 280 kilometers of transmission lines built with the Končar Group, and a 500 MW photovoltaic power plant by Greenvolt exclusively for the center's needs.

Original sector

Technology

Budget

Location

Country

Croatia

State

Sisak-Moslavina County

City

Topusko

Source

Source

Vreme

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Water Supply and Storage, Data Center, Road

Article published date

2026-05-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project