Panyu Oilfield Adjustment Joint Development Project
Sector: Oil and Gas • Location: China
Source: Society of Petroleum Engineers (SPE)
CNOOC announced that production at its Panyu 11-12/10-1/10-2 Oilfield Adjustment Joint Development Project began in January 2025. The project is expected to achieve a peak production of approximately 13,600 BOED in 2025.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- China
- Updated
- 22 Jul 2026
- Source
- Society of Petroleum Engineers (SPE)
ConstructChat
Ask ConstructChat about Panyu Oilfield Adjustment Joint Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CNOOC announced that production at its Panyu 11-12/10-1/10-2 Oilfield Adjustment Joint Development Project began in January 2025. The project is expected to achieve a peak production of approximately 13,600 BOED in 2025. |
Location
Country | China |
Source
Source | Society of Petroleum Engineers (SPE) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
