The Pap-Angren Railway Project of Uzbekistan has objectives to reduce transport costs and to increase transport capacity and reliability through the construction of a rail link between the Uzbek part of the Ferghana Valley and the rest of Uzbekistan. The project will be measured through the following PDO indicators: (i) transportation cost for public transport users; (ii) transportation costs for
- Status
- Closed
- Sector
- Mass Transit, Rail, Power Transmission, Automotive, Oil and Gas, Forest Products and Packaging, Tunnel, Power Generation (CCGT), Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pap-Angren Railway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Pap-Angren Railway Project of Uzbekistan has objectives to reduce transport costs and to increase transport capacity and reliability through the construction of a rail link between the Uzbek part of the Ferghana Valley and the rest of Uzbekistan. The project will be measured through the following PDO indicators: (i) transportation cost for public transport users; (ii) transportation costs for freight for oil and oil products, fertilizers, and automobiles; (iii) transport capacity; and (iv) reliability of rail services. The project consists of six components. Component one consists of the Uzbekistan Temir Yollari being responsible for the construction of the new railway line main infrastructure including embankments, ballast, rail, bridges and a 19.2 km long tunnel. Component two will finance four investments to equip and maintain the new railway line: (i) the installation of a microprocessor based train control system (estimated IBRD financing US$48 million); (ii) the construction of two traction substations and the installation of SCADA system (estimated IBRD financing US$30 million); (iii) the provision of necessary track maintenance equipment (estimated IBRD financing US$36 million); (iv) the installation of railway video surveillance and broadcasting system (estimated IBRD financing US$20 million); and a US$20 million contingency added to this component and embedded in the financing of the project to cover for possible change in technologies. Component three will finance three investments to bring energy to the new railway line: (i) the dismantling of overhead power lines (estimated IBRD financing US$2.6 million); (ii) the provision of equipment for the installation of new power lines (estimated IBRD financing US$13.3 million); (iii) the expansion of the Obihayot power substation and the construction of new power distribution lines (estimated IBRD financing US$17.6 million). Component four will provide technical assistance to strengthen (i) UTYs financial management and asset management capacity; (ii) modernized marketing arrangements; and (iii) capacity development. Component five will further elaborate the analytical work developed during project preparation under ECAPDEV trust fund. Component six will support UTY to monitor the project implementation, including procurement, supervision of the various contracts associated with the construction of the new railway line. |
Original sector | FY17 - Industry, Trade and Services,FY17 - Transportation |
Budget |
Location
Country | Uzbekistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Power Transmission, Automotive, Oil and Gas, Forest Products and Packaging, Tunnel, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Uzbekistan
- Uzbek Yolref Trans Railway Operator
- CAREC Corridors 2 and 3 (Marakand-Bukhara) Railway Electrification Project
- Construction of Yangiyer-Farkhad Single-track Electrified Line
- CAREC Corridor 6 (Marakand–Karshi) Railway Electrification Project
- Construction of double-track electrified railway line Yangiyer-Jizzakh
- Karshi-Termez Railway Line Electrification
- Bukhara-Samarkand Railway Electrification
- Angren-Pap Railway