logo

Paracel

Sector: Road • Location: Paraguay

Source: Inter-American Development Bank (IADB)

Project
Proposed

The proposed transaction consists of a senior secured A Loan to be provided to Paracel S.A. (“Paracel,” the “Company,” or the “Client”). Other international development finance institutions ("DFIs") are expected to participate under pari-passu Co-Loans ("Co-Loans").  Total Project costs (including mill capex, forestry, and financing costs) are estimated to be US$3.6 billion and are expected to be

Project Information FAQ

Project Information

4 Q
The project “Paracel” is an infrastructure initiative in the Road sector, located in Paraguay. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed transaction consists of a senior secured A Loan to be provided to Paracel S.A. (“Paracel,” the “Company,” or the “Client”). Other international development finance institutions ("DFIs") are expected to participate under pari-passu Co-Loans ("Co-Loans").  Total Project costs (including mill capex, forestry, and financing costs) are estimated to be US$3.6 billion and are expected to be financed with a combination of equity and long-term debt.Paracel is a joint venture established by Copetrol (Paraguay) and Girindus Investments (Sweden), among other investors who have joined the Project afterwards. The Company is developing a greenfield kraft pulp mill and associated eucalyptus plantations (the “Project”) in the Departments of Concepción and Amambay, Paraguay. Paracel expected production is up to 1.8 million metric tons per year of Bleached Eucalyptus Kraft Pulp (“BEKP”). Paracel will be the largest industrial development and the largest private investment in Paraguay’s history, as well as the first large-scale pulp mill. The Project will outsource the development of the required export outbound logistics (river and seaports).Paracel is expected to generate approximately 220MW of renewable energy of which about 100MW are expected to be sold to the national grid. The mill will be located on a 1,200 hectare (ha) former cattle ranch 13 kilometers (km) due north of and 18 km by existing roads from the city of Concepción, on the left bank of the Paraguay river. The Paraguay river will be the water source for the mill and the receiving water body for treated effluents.A major Project component is the approximately 190,000 ha of former cattle ranch properties in the Departments of Concepción and Amambay owned and to be partially converted to eucalyptus plantations (the rest to be conserved) by the Company to supply wood to the mill in future years. The mill will consume about six million cubic meters of eucalyptus wood per year once operational1. The area of influence of the eucalyptus plantation properties includes nine indigenous communities of the Pai Tavyterá and Mbya guaraní ethnic groups of the guarani linguistic family. In addition, the urban area of Concepción has a multi-ethnic indigenous community in the area of influence for both the mill and plantations that is occupied by mostly speakers of the Maskoy language family. The Project will also construct ancillary facilities: i) a new substation at the mill site; and ii) a 25-km transmission line to connect the Project’s substation to the national grid. The Project will also include the following associated facilities: i) six worker lodgings in the city of Concepción, with a total capacity of 8,000 people; ii) a riverine port facility for loading pulp onto barges in Paraguay; and iii) an existing coastal shipping export terminal in Uruguay.The Project is being designed using the best available technology.  Its pre-construction phase initiated in January 2021 and construction is expected to last until November 2023, for a total of 28 months. Mill operation is estimated to initiate by the end of 2023.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data