logo

Parallel Thimble Shoal Tunnel

Sector: Automotive • Location: Virginia, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The Parallel Thimble Shoal Tunnel project entails the construction of a 5,700-foot bored tunnel connecting two southbound trestles of the existing Chesapeake Bay Bridge and Tunnel, a 17.6 mile structure connecting the Norfolk/Virginia Beach areas to Virginia's eastern shore. The CBBT first opened to traffic on April 15, 1964, providing one lane of travel in each direction across a series of bridge

Project Information FAQ

Project Information

5 Q
The project “Parallel Thimble Shoal Tunnel” is an infrastructure initiative in the Automotive sector, located in Virginia, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Parallel Thimble Shoal Tunnel project entails the construction of a 5,700-foot bored tunnel connecting two southbound trestles of the existing Chesapeake Bay Bridge and Tunnel, a 17.6 mile structure connecting the Norfolk/Virginia Beach areas to Virginia's eastern shore. The CBBT first opened to traffic on April 15, 1964, providing one lane of travel in each direction across a series of bridges and trestles and through two tunnels. In 1990, the Commonwealth of Virginia agreed to construct an additional crossing parallel to the existing structure, doubling its capacity. The second crossing would improve safety and provide an alternate route in the event of a traffic incident. The second set of parallel bridges and trestles opened in 1999, however, the facility's two tunnels were not expanded. Each still accommodated one lane of traffic in each direction. When complete, the new tunnel will carry two lanes of traffic southbound and the existing tunnel will carry two lanes of traffic northbound. (The CBBT's other tunnel will not be expanded as a part of this project.) The additional capacity will alleviate disruption from disabled vehicles or accidents (averaging 25 per year), lane closures from oversized escorts (338 per year) and routine maintenance (1,400 hours per year), and eliminate the inherent hazard of a contraflow tunnel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data