Paramount Pump Station Improvements
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
construction of Paramount Pump Station Improvements, Project No. SW1191. A brief description is as follows: Construction of the new 1.0 MGD submersible wastewater lift station and influent piping, connection to the existing 6-inch ductile iron force main, and demolition of the existing lift station. All electrical and instrumentation work associated with improvements. Associated earthwork, erosion
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Steel, Commercial
- Location
- Cary, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Paramount Pump Station Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction of Paramount Pump Station Improvements, Project No. SW1191. A brief description is as follows: Construction of the new 1.0 MGD submersible wastewater lift station and influent piping, connection to the existing 6-inch ductile iron force main, and demolition of the existing lift station. All electrical and instrumentation work associated with improvements. Associated earthwork, erosion control, seeding, drainage, access roadways, and other site work improvements. Any required temp... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Cary |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
