logo

Paramount Theater Renovation & Addition

Sector: Manufacturing (Industrial) • Location: Burlington, North Carolina, United States of America

Source: Dodge

Project
Closed

t 128 East Front Street, Burlington, NC 27215, as described in the contract documents. Work will include demolition of an existing 1-story building; construction of a new 3-story, 10,000 SF building with an occupiable roof deck; and upgrade/replacement of plumbing, mechanical, electrical, fire alarm systems as well as performance lighting, sound, rigging systems, and theater seating in the existin

Status
Closed
Sector
Manufacturing (Industrial), Road, Power Generation (CCGT), Government, Commercial
Location
Burlington, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Paramount Theater Renovation & Addition

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Paramount Theater Renovation & Addition” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Burlington, North Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

t 128 East Front Street, Burlington, NC 27215, as described in the contract documents. Work will include demolition of an existing 1-story building; construction of a new 3-story, 10,000 SF building with an occupiable roof deck; and upgrade/replacement of plumbing, mechanical, electrical, fire alarm systems as well as performance lighting, sound, rigging systems, and theater seating in the existing Paramount Theater.

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Burlington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Road, Power Generation (CCGT), Government, Commercial

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project