Parana Water Security Project
Pipeline · Brazil
Source: World Bank Group
The Project will adopt an integrated, multisectoral approach focusing on three interrelated topics: (a) the sustainable management of water resources, which is the foundation of water security for people, the economy and biodiversity as water is a shared and finite resource; (b) the water security for agriculture production, the main driver of Parana’s economy, and, at the same time, the reduction
- Status
- Prospective
- Sector
- Water Supply and Storage, Biomass, Raw Materials, Waste Processing and Treatment, Government
- Location
- Brazil
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Parana Water Security Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project will adopt an integrated, multisectoral approach focusing on three interrelated topics: (a) the sustainable management of water resources, which is the foundation of water security for people, the economy and biodiversity as water is a shared and finite resource; (b) the water security for agriculture production, the main driver of Parana’s economy, and, at the same time, the reduction of agriculture contribution to water security risks and (c) the water security for potable water supply to increase its resilience to climate risks and to support the universalization goal, while reducing WSS contributions to water security risks. Retroactive financing is being considered for the Project which includes 4 components:Component 1 – Strengthen climate-informed water resources management. By promoting a better integrated, participatory, resilient and data-driven water resources governance and infrastructure, the component contributes to reducing pressures on water resources quantity and quality and supports more effective preparedness and responses to increasing climate change risks. In doing so, it lays the institutional and technical foundations for improving water security across the State, with emphasis on priority areas where activities are implemented in an integrated manner with other components. Subcomponent 1.1 – Modernize water monitoring, information and management instruments. Subcomponent 1.2 – Improve integrated water resources governance. Subcomponent 1.3 – Reduce urban and peri-urban erosion. Component 2 – Enhance agriculture water security and reduce associated risks. This component is designed to enhance water security for agricultural production amid rising water shortages and land degradation exacerbated by climate change. It also seeks to reduce the risks of water contamination and water shortages in selected urban water sources associated with land degradation, agrochemical use, animal waste and climate change. Efforts will center on strengthening institutional and technical capacities, leveraging partnerships with cooperatives and local organizations, generating innovation and promoting the adoption of sustainable conservation and production practices.Subcomponent 2.1. – Strengthen the State capacity to manage water security risks in agriculture. Subcomponent 2.2 – Increasing Water Security for Family Farming in Areas Affected by Water Deficit and Soil Degradation.Subcomponent 2.3. – Decrease agriculture contribution to water security risks in urban water sources. Component 3 – Reduce water security risk for universal WSS access. This component aims to enhance the climate resilience, quality, and availability of water and sanitation services by reducing reduce water security risks in selected watersheds of urban water sources and addressing both infrastructure and management model gaps in rural areas, in support of the universalization goals. Subcomponent 3.1 – Reduce water security risks in selected urban water sources. Subcomponent 3.2 – Increase access to sustainable rural water and sanitation services. Component 4 – Support Project Management. This component builds the Borrower’s capacity to implement the Project by supporting fiduciary, technical, environmental, social, and monitoring activities. It provides funding for technical assistance, consulting and non-consulting services, training, operating costs, and necessary goods for key government agencies involved in implementation. |
Original sector | Agriculture, Fishing and Forestry,Public Administration,Water, Sanitation and Waste Management |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Raw Materials, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
