Parc éolien de Tanger
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
Creation of a 140 MW wind farm consisting of turbines with a power rating of 850 kW or above (i.e. up to 165 units). Projected annual power generation is around 500 GWh. The wind farm will be located about 15 km east of Tangiers. The energy produced will be fed into the national grid at the existing Melloussa sub-station via two 225 kV lines.
- Status
- Under Construction
- Sector
- Raw Materials, Residential, Commercial, Wind, Power Generation (CCGT), Government
- Location
- Morocco
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Parc éolien de Tanger
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Creation of a 140 MW wind farm consisting of turbines with a power rating of 850 kW or above (i.e. up to 165 units). Projected annual power generation is around 500 GWh. The wind farm will be located about 15 km east of Tangiers. The energy produced will be fed into the national grid at the existing Melloussa sub-station via two 225 kV lines. |
Original sector | Energy |
Location
Country | Morocco |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Residential, Commercial, Wind, Power Generation (CCGT), Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
