logo
ProjectClosed

Parcel 86 Pipe Realignment

Closed · Washington · Last reported Nov 2024

Source: Dodge USA

The Work required for this Project includes: Parcel 86 at 3701 Taylor Way supports 3 heavy industrial users. The goal is to repair and re-establish the drainage, maintain compliance with our permits, improve tenant ability to comply with their industrial stormwater general permit, and improve water quality. The project will include lowering of the existing Outfall 11193 to 10.00 feet and installin

Status
Closed
Sector
Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment
Location
Tacoma, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Parcel 86 Pipe Realignment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Parcel 86 Pipe Realignment” is an infrastructure initiative in the Water Supply and Storage sector, located in Tacoma, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work required for this Project includes: Parcel 86 at 3701 Taylor Way supports 3 heavy industrial users. The goal is to repair and re-establish the drainage, maintain compliance with our permits, improve tenant ability to comply with their industrial stormwater general permit, and improve water quality. The project will include lowering of the existing Outfall 11193 to 10.00 feet and installing deeper pipes at or above the industry standard minimum pipe slope of 0.005 feet/feet. The selec...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Tacoma

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project