logo
ProjectPlanned

Parcel H5A Mixed-Use Building

One of 10,000+ projects Taiyo tracks in Utah.

Source: Building Salt Lake

Parcel H5A is a mixed-use building planned along The Promenade at The Point, featuring 363 residential units and 42,000 square feet of ground floor retail. Construction is expected to take 30-36 months, with delivery anticipated around early 2029.

Status
Prospective
Sector
Commercial, Residential
Location
Draper, Utah, United States of America
Updated
22 Jul 2026
Source
Building Salt Lake

ConstructChat

Ask ConstructChat about Parcel H5A Mixed-Use Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Parcel H5A Mixed-Use Building” is an infrastructure initiative in the Commercial sector, located in Draper, Utah, United States. Taiyo aggregates data on it from Building Salt Lake.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Parcel H5A is a mixed-use building planned along The Promenade at The Point, featuring 363 residential units and 42,000 square feet of ground floor retail. Construction is expected to take 30-36 months, with delivery anticipated around early 2029.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Utah

City

Draper

Source

Source

Building Salt Lake

URL

More Details

Record type

Project

Sector

Commercial, Residential

Article published date

2026-04-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project