logo

PARE hydroelectric power station (NEEPCO), expansion

Sector: Hydro • Location: India

Source: KFW Bank aus Verantwortung

Project
Completed

The FC measure includes the construction of the new Pare hydroelectric power plant with an installed capacity of 110 MW in the underdeveloped north-east of India. The aim of the FC measure is the sustainable provision of climate-friendly energy for economic development through the use of hydropower. The total costs of the project were estimated at around EUR 132.2 million at the time of project ap

Project Information FAQ

Project Information

5 Q
The project “PARE hydroelectric power station (NEEPCO), expansion” is an infrastructure initiative in the Hydro sector, located in India. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC measure includes the construction of the new Pare hydroelectric power plant with an installed capacity of 110 MW in the underdeveloped north-east of India. The aim of the FC measure is the sustainable provision of climate-friendly energy for economic development through the use of hydropower. The total costs of the project were estimated at around EUR 132.2 million at the time of project appraisal. To finance the debt portion of the total costs, integrated joint financing of EUR 80 million and a grant of EUR 0.5 million for an accompanying measure were made available on December 11, 2008. However, significant cost increases have occurred in connection with the construction of the Pare hydroelectric power plant, and the total costs of the project are currently estimated at around EUR 157.4 million. In view of the significant additional costs in the construction of the Pare hydroelectric power plant, the existing loan financing is to be increased by around EUR 20 million to EUR 100 million. To finance the increase - contrary to the original form of financing - a low-interest loan of around EUR 20 million is to be made available.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data