Paredinha Hydropower Plant
One of 10,000+ projects Taiyo tracks in Brazil.
Source: International Water Power
The Paredinha Hydropower Plant in Brazil involves the supply of three hydraulic turbines rated at 7,292 kW each, three 7,788 kVA generators, ten transformers totaling approximately 50,000 kVA, electrical panels, a substation, and all associated electrical installation. The project owner is Ibemapar, and WEG was contracted to provide a full package of electromechanical equipment to ensure plant eff
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Hydro
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- International Water Power
ConstructChat
Ask ConstructChat about Paredinha Hydropower Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Paredinha Hydropower Plant in Brazil involves the supply of three hydraulic turbines rated at 7,292 kW each, three 7,788 kVA generators, ten transformers totaling approximately 50,000 kVA, electrical panels, a substation, and all associated electrical installation. The project owner is Ibemapar, and WEG was contracted to provide a full package of electromechanical equipment to ensure plant efficiency and operational longevity. |
Original sector | Energy |
Location
Country | Brazil |
Source
Source | International Water Power |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Hydro |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
