Paris Fire Station 1 Construction
Bid results · Tennessee · Last reported Sep 2025
Source: Dodge
WORK COVERED BY CONTRACT DOCUMENTS 1. The work of this contract comprises of 1. Site Grading, Drainage, Paving 2. Landscaping 3. General Building Construction 4. ICC-500 Safe Room Construction 5. Masonry Construction 6. Metal Wall Panels 7. Doors & Windows 8. Membrane and Metal Roof Systems 9. Interior Finishes 10. Mechanical and Plumbing Systems 11. Sprinkler System 12. New Electrical Systems 13.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Cement, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Paris, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Paris Fire Station 1 Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WORK COVERED BY CONTRACT DOCUMENTS 1. The work of this contract comprises of 1. Site Grading, Drainage, Paving 2. Landscaping 3. General Building Construction 4. ICC-500 Safe Room Construction 5. Masonry Construction 6. Metal Wall Panels 7. Doors & Windows 8. Membrane and Metal Roof Systems 9. Interior Finishes 10. Mechanical and Plumbing Systems 11. Sprinkler System 12. New Electrical Systems 13. Fire Alarm System 2. Not included in the bidder s scope, but to be coordinated with the City of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Paris |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Cement, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
