Park Ave & Harris Street Revitalization
Sector: Water Supply and Storage • Location: Ketchikan, Alaska, United States of America
Source: Dodge
The purpose of the project is to preserve the functionality of infrastructure on Park Avenue and Harris Street by rebuilding the infrastructure from the deepest utilityto the surface of the road. This includes replacing heavily deteriorated corrugated metal sewer mains, water main, storm drains, roadway subgrade, surfacing,sidewalks, and a retaining wall through Park Avenue between Bawden Street a
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Bridge, Metal, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Ketchikan, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Park Ave & Harris Street Revitalization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to preserve the functionality of infrastructure on Park Avenue and Harris Street by rebuilding the infrastructure from the deepest utilityto the surface of the road. This includes replacing heavily deteriorated corrugated metal sewer mains, water main, storm drains, roadway subgrade, surfacing,sidewalks, and a retaining wall through Park Avenue between Bawden Street and Freeman Street, and along the entire length of Harris Street between the HarrisStreet Bridge a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Ketchikan |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Bridge, Metal, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
