Park Rangers Office Tenant Improvements
Sector: Water Supply and Storage • Location: Bakersfield, California, United States of America
Source: Dodge
The Work to Be Performed Consists, in General, of: 2265 Sf Tenant Improvement of One (1) Suite on the First Floor of an Existing 7,166 Sf 2 Story Building. Tenant Improvement Includes Three (3) Offices, One (1) Open Office, One (1) Server Room, One (1) Janitor Room, Two (2) Unisex Restrooms, Two (2) Unisex Locker Rooms, One (1) Unisex Shower Room, One (1) Water Heater Room, One (1) Electrical Room
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Rail, Commercial, Car parking, Power Generation (CCGT), Automotive, Residential, Manufacturing (Industrial)
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Park Rangers Office Tenant Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to Be Performed Consists, in General, of: 2265 Sf Tenant Improvement of One (1) Suite on the First Floor of an Existing 7,166 Sf 2 Story Building. Tenant Improvement Includes Three (3) Offices, One (1) Open Office, One (1) Server Room, One (1) Janitor Room, Two (2) Unisex Restrooms, Two (2) Unisex Locker Rooms, One (1) Unisex Shower Room, One (1) Water Heater Room, One (1) Electrical Room, & One (1) Training Room. No Work on the 2nd Floor and No Site Work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Rail, Commercial, Car parking, Power Generation (CCGT), Automotive, Residential, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
