Park Road Reconstruction
Sector: Water Supply and Storage • Location: Warrington Township, Pennsylvania, United States of America
Source: Dodge USA
for the Park Road Reconstruction project. The work includes but is not limited to all labor, materials, tools, oversight and permits required to reconstruct the road, with new full-depth asphalt pavement, including the installation of new walkways, and/or replace existing walkways, installation of new stormwater conveyance features, trench restoration, E&S controls, new waterline piping, PennDOT H
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- Warrington Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Park Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for the Park Road Reconstruction project. The work includes but is not limited to all labor, materials, tools, oversight and permits required to reconstruct the road, with new full-depth asphalt pavement, including the installation of new walkways, and/or replace existing walkways, installation of new stormwater conveyance features, trench restoration, E&S controls, new waterline piping, PennDOT Highway Occupancy upgrades, ADA compliant walkways, pavement markings and maintenance and protecti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Warrington Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
