Park St Bridge Superstructure Replacement
Sector: Car parking • Location: North Reading, Massachusetts, United States of America
Source: Dodge USA
Superstructure replacement on Park Street over Martin's Brook. Project includes demo of existing bridge superstructure and railings, and selective demo at the abutments. The new superstructure will include precast concrete deck beams, a concrete deck, concrete approach slabs, concrete abutment caps, concrete bridge rails and approach guardrail improvements. The project also includes the relocation
- Status
- Closed
- Sector
- Car parking, Road, Water Supply and Storage, Cement, Power Transmission, Rail, Bridge, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- North Reading, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Park St Bridge Superstructure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Superstructure replacement on Park Street over Martin's Brook. Project includes demo of existing bridge superstructure and railings, and selective demo at the abutments. The new superstructure will include precast concrete deck beams, a concrete deck, concrete approach slabs, concrete abutment caps, concrete bridge rails and approach guardrail improvements. The project also includes the relocation of water and gas mains across the bridge via structural utility supports. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | North Reading |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Cement, Power Transmission, Rail, Bridge, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
