Park Station Hydraulic Gate Replacement
Closed · New York · Last reported Jan 2025
Source: Dodge
The Work includes replacement of hydraulic operator, hydraulic system controls and hydraulic lines on to the underwater sluice gate for the drain system of the Park station Recreation Area Reservior.
- Status
- Closed
- Sector
- Car parking, Commercial, Manufacturing (Industrial), Automotive, Government, Waste Processing and Treatment
- Location
- Erin, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Park Station Hydraulic Gate Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes replacement of hydraulic operator, hydraulic system controls and hydraulic lines on to the underwater sluice gate for the drain system of the Park station Recreation Area Reservior. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Erin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Manufacturing (Industrial), Automotive, Government, Waste Processing and Treatment |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
