Park to Midtown Place Apartments Water Main Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
8" to 12" Water Main Replacement for Fire Protection & Reliability WF-61. Park to Midtown Place Apartments (Water Main Replacement) This project will replace the existing 8 cast iron water main from Park north to the new Midtown Place Apartments with a new 12 water main. Upsizing the main will increase capacity in this area. This project will be paid for entirely by City funds and is consistent wi
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Steel, Metal, Car parking, Waste Processing and Treatment, Residential, Automotive
- Location
- Troy, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Park to Midtown Place Apartments Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 8" to 12" Water Main Replacement for Fire Protection & Reliability WF-61. Park to Midtown Place Apartments (Water Main Replacement) This project will replace the existing 8 cast iron water main from Park north to the new Midtown Place Apartments with a new 12 water main. Upsizing the main will increase capacity in this area. This project will be paid for entirely by City funds and is consistent with the 2020 reliability study. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Troy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Steel, Metal, Car parking, Waste Processing and Treatment, Residential, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
