logo
ProjectPlanning Schematics

Parker Solar (250 MW) BESS Storage Project (250 MW)

One of 10,000+ projects Taiyo tracks in Arizona.

Source: Dodge USA

250MW solar and battery storage project, located on approximately 1,960 acres of land wholly bordered by the BLM

Status
Prospective
Sector
Solar, Consumer Products, Energy Storage, Power Generation (CCGT), Raw Materials, Commercial
Location
Quartzsite, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Parker Solar (250 MW) BESS Storage Project (250 MW)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Parker Solar (250 MW) BESS Storage Project (250 MW)” is an infrastructure initiative in the Solar sector, located in Quartzsite, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

250MW solar and battery storage project, located on approximately 1,960 acres of land wholly bordered by the BLM

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Quartzsite

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Solar, Consumer Products, Energy Storage, Power Generation (CCGT), Raw Materials, Commercial

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project