logo
ProjectClosed

Parking Garage 7 High Priority Repairs

Closed · California · Last reported Dec 2024

Source: Dodge USA

The scope of work includes but is not limited to; partial depth concrete floor repair, overhead slab repair, joist repair, beam repair, concrete wall repair, bumper wall concrete repair, column repair, precast fa ade repair, installation of new barrier cables, installation of intermediate bars in perimeter barriers, stair landing floor repairs, concrete tread repair, bollard repair, stair handrail

Status
Closed
Sector
Commercial, Telecommunications, Cement, Car parking, Manufacturing (Industrial), Automotive, Government
Location
Fresno, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Parking Garage 7 High Priority Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Parking Garage 7 High Priority Repairs” is an infrastructure initiative in the Commercial sector, located in Fresno, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work includes but is not limited to; partial depth concrete floor repair, overhead slab repair, joist repair, beam repair, concrete wall repair, bumper wall concrete repair, column repair, precast fa ade repair, installation of new barrier cables, installation of intermediate bars in perimeter barriers, stair landing floor repairs, concrete tread repair, bollard repair, stair handrail repairs, install new bollards, repair broken post tension tendons, and exploratory openings at p...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Fresno

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Telecommunications, Cement, Car parking, Manufacturing (Industrial), Automotive, Government

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project