Parking Garage
Sector: Steel • Location: Miami, Florida, United States of America
Source: Dodge
Spalled concrete with steel reinforcement exposed and signs of corrosion. The affected areas with spalling concrete and all deteriorated concrete at slab, must be cut up to (3 ) Inches of concrete per square feet removed, to allow room for rebar re- placement and providing two (2 ) inches of concrete coverage. Concrete removal and replacement procedure: Spalling concrete: 1. Demolish, chip and rem
- Status
- Closed
- Sector
- Steel, Cement, Commercial, Car parking, Automotive, Manufacturing (Industrial), Metal
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Parking Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Spalled concrete with steel reinforcement exposed and signs of corrosion. The affected areas with spalling concrete and all deteriorated concrete at slab, must be cut up to (3 ) Inches of concrete per square feet removed, to allow room for rebar re- placement and providing two (2 ) inches of concrete coverage. Concrete removal and replacement procedure: Spalling concrete: 1. Demolish, chip and remove all cracked, spalled or otherwise unsound concrete. 2. Excavate concrete completely around co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Commercial, Car parking, Automotive, Manufacturing (Industrial), Metal |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
