Parking Lot 105 Improvements at MJC East Campus
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project consists of the removal and replacement of existing Parking Lot 105, new concrete paved walkways and modifications to existing landscape and irrigation, fencing, limited work within the public right-of-way, on site plumbing improvements and the installation of electric vehicle charging stations.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Commercial, Car parking, Power Generation (CCGT), Automotive, Electric Vehicles (EVs)
- Location
- Modesto, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Parking Lot 105 Improvements at MJC East Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the removal and replacement of existing Parking Lot 105, new concrete paved walkways and modifications to existing landscape and irrigation, fencing, limited work within the public right-of-way, on site plumbing improvements and the installation of electric vehicle charging stations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Modesto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Commercial, Car parking, Power Generation (CCGT), Automotive, Electric Vehicles (EVs) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
