Parking Lot 19 Reconstruction
Sector: Commercial • Location: Whitewater, Wisconsin, United States of America
Source: Dodge USA
Project work includes complete reconstruction of the parking lot; replacement of concrete curb, gutter, and catch basins as required; and providing new storm water management features. Because this lot is located in a low area known to have poor soils, site borings and investigation will be completed to determine if the subgrade is adequate for parking lot construction or if full excavation below
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Education, Road, Waste Processing and Treatment, Car parking, Automotive
- Location
- Whitewater, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Parking Lot 19 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project work includes complete reconstruction of the parking lot; replacement of concrete curb, gutter, and catch basins as required; and providing new storm water management features. Because this lot is located in a low area known to have poor soils, site borings and investigation will be completed to determine if the subgrade is adequate for parking lot construction or if full excavation below subgrade (EBS) will be required. Project work may include removing the asphalt and base course an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Whitewater |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Education, Road, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
