Parking Lot Resurfacing
Sector: Car parking • Location: Madison, Wisconsin, United States of America
Source: Dodge USA
Description: Clean, prep, resurface and seal approximately 10,500 sq feet of paved surface around the US Dairy Forage Research Center. Area in scope includes the parking lot (6900 sq feet), the loading dock (3000 sq feet), and a small, paved area at the greenhouse alley entrance (600 sq feet). Restripe parking stalls to match existing.
- Status
- Closed
- Sector
- Car parking, Consumer Products, Automotive, Commercial
- Location
- Madison, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Parking Lot Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: Clean, prep, resurface and seal approximately 10,500 sq feet of paved surface around the US Dairy Forage Research Center. Area in scope includes the parking lot (6900 sq feet), the loading dock (3000 sq feet), and a small, paved area at the greenhouse alley entrance (600 sq feet). Restripe parking stalls to match existing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Consumer Products, Automotive, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
