Parks Pedestrian Lighting Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The goal of this project is to improve lighting at City parks as part of the Crime Prevention Through Safer Streets Grant Program. The work locations are Columbine Park and Hawthorne Park, and generally consists of the removal of existing lighting equipment, the installation of 5,042 LF of 2-inch electrical conduit, 57 type two pull boxes, 52 light fixtures and foundations, 1 lighting controller,
- Status
- Prospective
- Sector
- Power Generation (CCGT), Car parking, Road, Government, Automotive, Commercial
- Location
- Grand Junction, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Parks Pedestrian Lighting Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The goal of this project is to improve lighting at City parks as part of the Crime Prevention Through Safer Streets Grant Program. The work locations are Columbine Park and Hawthorne Park, and generally consists of the removal of existing lighting equipment, the installation of 5,042 LF of 2-inch electrical conduit, 57 type two pull boxes, 52 light fixtures and foundations, 1 lighting controller, and associated wiring for installation. Additionally, as an add alternate, work at Sherwood Park ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Grand Junction |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Road, Government, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
