logo

Parkside Clubhouse

Sector: Commercial • Location: Lebanon, Ohio, United States of America

Source: Dodge USA

Project
Bid Results

Parkside Subdivision is adding a new 4,068 square foot clubhouse to their subdivision on OH-63 in Lebanon Ohio 2. Scope of work includes, but not limited to: a. Existing Conditions: i. Site is to be pad ready. ii. Utilities to be installed within 5ft of the proposed building. b. Site development: i. Site is to be pad ready. ii. Excavation for building pad. c. Concrete: i. Concrete foundations and

Status
Closed
Sector
Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Cement
Location
Lebanon, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Parkside Clubhouse

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Parkside Clubhouse” is an infrastructure initiative in the Commercial sector, located in Lebanon, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Parkside Subdivision is adding a new 4,068 square foot clubhouse to their subdivision on OH-63 in Lebanon Ohio 2. Scope of work includes, but not limited to: a. Existing Conditions: i. Site is to be pad ready. ii. Utilities to be installed within 5ft of the proposed building. b. Site development: i. Site is to be pad ready. ii. Excavation for building pad. c. Concrete: i. Concrete foundations and pedestals. ii. Slab-on-grade. iii. Stamped concrete porch slab. d. Masonry: i. Stone veneer. ii. ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Lebanon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Cement

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project