Parkside Estates & Various Locations Water Main Replace
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
The work to be performed includes, but is not limited to, replacing aging water pipelines, water meters, valves, and hydrants within two neighborhoods. The project is located in two neighborhoods within the City of Ceres, referred to as Project Location #1 (Phase 1) and Project Location #2 (Phase 2). Project Location #1 (Phase 1) is bordered by Caswell Avenue to the north, Moffett Road to the east
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Government
- Location
- Ceres, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Parkside Estates & Various Locations Water Main Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed includes, but is not limited to, replacing aging water pipelines, water meters, valves, and hydrants within two neighborhoods. The project is located in two neighborhoods within the City of Ceres, referred to as Project Location #1 (Phase 1) and Project Location #2 (Phase 2). Project Location #1 (Phase 1) is bordered by Caswell Avenue to the north, Moffett Road to the east, E. Whitmore Avenue to the south, and 5th Street to the west. Project Location #2 (Phase 2) is b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Ceres |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
