Paroseni Coal-Fired Power Plant Closure and Transition
Sector: Power Generation (CCGT) • Location: Romania
Source: Energy Industry Review
The Paroseni coal-fired power plant in the Jiu Valley, Romania, is scheduled to close by 2032 as part of the region's energy transition. The plant's closure is part of Romania's broader shift away from coal towards gas and digital infrastructure.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Romania
- Updated
- 22 Jul 2026
- Source
- Energy Industry Review
ConstructChat
Ask ConstructChat about Paroseni Coal-Fired Power Plant Closure and Transition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Paroseni coal-fired power plant in the Jiu Valley, Romania, is scheduled to close by 2032 as part of the region's energy transition. The plant's closure is part of Romania's broader shift away from coal towards gas and digital infrastructure. |
Original sector | Energy |
Location
Country | Romania |
Source
Source | Energy Industry Review |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
