Parque Montornés Norte: Regeneración Urbana / Hiha Studio
Sector: Consumer Products • Location: Spain
Source: ArchDaily
5- Create a park that respects the water cycle by prioritizing the infiltration of rainwater into the ground through drainage ditches and achieving annual infiltration rates close to 740m3. 6- To improve the living conditions of the neighbors in an area with strong deficiencies in public space, organizing spatially the activities and the program resulting from the participatory process.2- To attai
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 5- Create a park that respects the water cycle by prioritizing the infiltration of rainwater into the ground through drainage ditches and achieving annual infiltration rates close to 740m3. 6- To improve the living conditions of the neighbors in an area with strong deficiencies in public space, organizing spatially the activities and the program resulting from the participatory process.2- To attain a dialogue between the Park and the biodiversity of the Turó de les Tres Creus, reserving 50% of the surface to be vegetated over time by the natural cycles with large carpets of plowed, fertile surface, stimulated with hydroseeding but waiting that, year after year, diverse seeds from the vegetation of the Turó de les Tres Creus are deposited. 3- To achieve a Park that generates biodiversity and decarbonizes by prioritizing autochthonous species with flowers, fruits and high CO₂ absorption capacities. 4- Taking advantage of the opportunity of having an existing building of the abandoned sports facilities, to transform all this demolished mass into gravel to make the drainage ditches and pavements.Text description provided by the architects.The objective of the project has been the urban regeneration of an area of 8110m2 transforming what was an old abandoned sports facility into a new Urban Park. The challenges of the project have been diverse: 1- To make a Park that brings back the imaginary of plowed fields and orchards that existed in the area, promoting a very marked linearity in the elements, a cultivated nature and putting in the center the resource of plowing the soil as a tool of design and project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
