logo

Parque Rimac Toll Road

Sector: Road • Location: Peru

Source: World Bank Group

Project
Active

A 30-year concession for the construction and operation of the project was awarded to Línea Amarilla, owned by Brazil's Invepar, in November 2009

The total project cost was US$983 million. The project reached financial closure in July 2012 with a combination of bank loans and bond financing.

In 2012, BNP Paribas closed the US$983mfinancing, including US$527m in debt, for Via Parque Rimac, forme

Status
Prospective
Sector
Road, Cable car, Tunnel, Bridge, Telecommunications, Government, Manufacturing (Industrial), Automotive, Commercial
Location
Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Parque Rimac Toll Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Parque Rimac Toll Road” is an infrastructure initiative in the Road sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 30-year concession for the construction and operation of the project was awarded to Línea Amarilla, owned by Brazil's Invepar, in November 2009 The total project cost was US$983 million. The project reached financial closure in July 2012 with a combination of bank loans and bond financing. In 2012, BNP Paribas closed the US$983mfinancing, including US$527m in debt, for Via Parque Rimac, formerly called Linea Amarilla. BNP Paribas acted as adviser, sole structuring bank,bookrunner and placement agent. The bank structured what it called asophisticated transaction, combining bond and bank tranches. The bondtranche had a record tenor of 25 years, and an AAA local rating from Apoyoy Asociados Internacionales, a Fitch affiliate in Peru. The debt portioninvolved US$140m for a 25-year bond, US$305m for a 25-year local inflationadjusted bond- both in nuevo soles- and US$82m for a 10-year loan fromlocal banks. Both bonds matured on June 30 2037. In February 2013, after municipal government changed, an addenda to the contract was signed and the project got the name of Via Parque Rimac (initially called Linea Amarilla), including as main changes: some additional works, the participation of the government on 7% of toll collection, the expansion of the concession period to 40 years and a US$9.1 million contribution to the Fondo Municipal de la Inversión Privada (FOMPRI). In August 2016, Vince acquired LAMSAC, the project company, from Invepar in a transaction valued at Euros 1.5 billion.

Original sector

Transport

Procurement method

Budget

Location

Country

Peru

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Cable car, Tunnel, Bridge, Telecommunications, Government, Manufacturing (Industrial), Automotive, Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project