Parry Drive Watermain Looping
Completed · Ontario
Source: Infrastructure Canada
The Batawa Development Corporation (BDC) is proceeding with a residential subdivision at the north end of Fraser Drive in Batawa. As part of their development requirements, they are required to extend a water main from the bulk water station to Fraser Drive, along Parry Drive. The extension of this water main gives the City a unique opportunity to partner with the BDC and the developer and loop th
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Parry Drive Watermain Looping
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Batawa Development Corporation (BDC) is proceeding with a residential subdivision at the north end of Fraser Drive in Batawa. As part of their development requirements, they are required to extend a water main from the bulk water station to Fraser Drive, along Parry Drive. The extension of this water main gives the City a unique opportunity to partner with the BDC and the developer and loop this water main to Sidney Crescent. The installation of 270 m of 200 mm Polyvinyl Chloride (PVC) watermain would provide additional flows for firefighting, improve water quality, address future growth pressures, and provide a backup supply in the event of a break. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
