logo

Parsons Creek Phase 2A

Sector: Commercial • Location: Fort Mcmurray, Alberta, Canada

Source: Dodge USA

Project
Bidding

4ea Catch Basins with Leads ? 8ea Catch Basin Manholes with Leads ? 180lm of Flushing & CCTV ? 6,680m2 of Collector Roadway Base & Asphalt ? 1,250lm of Concrete Curb & Gutter ? 180lm of Concrete Monolithic Sidewalk ? 1750m2 of Concrete Separate Walk ? 890m2 of Concrete Median Fill ? 330m2 of Reinforced Concrete Truck Apron ? Signage & Traffic Markings ? 300lm of Utility Duct Road Crossings ? Misce

Status
Prospective
Sector
Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Power Generation (CCGT)
Location
Fort Mcmurray, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Parsons Creek Phase 2A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Parsons Creek Phase 2A” is an infrastructure initiative in the Commercial sector, located in Fort Mcmurray, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

4ea Catch Basins with Leads ? 8ea Catch Basin Manholes with Leads ? 180lm of Flushing & CCTV ? 6,680m2 of Collector Roadway Base & Asphalt ? 1,250lm of Concrete Curb & Gutter ? 180lm of Concrete Monolithic Sidewalk ? 1750m2 of Concrete Separate Walk ? 890m2 of Concrete Median Fill ? 330m2 of Reinforced Concrete Truck Apron ? Signage & Traffic Markings ? 300lm of Utility Duct Road Crossings ? Miscellaneous Grading & Site Preparation

Procurement method

Location

Country

Canada

State

Alberta

City

Fort Mcmurray

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Power Generation (CCGT)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project