Parsons Road Resurfacing
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: Markham Street to Mariposa Avenue Length: Approximately 1 mile District: 1 Community: Glen Valley
The County of Riverside Transportation Department is proposing to resurface approximately 1 mile of Parsons Road from Markham Street to Mariposa Avenue. Parsons Road is classified as a Local Road in the County of Riverside General Plan. Parsons Road is a two lane road and currently ranges fro
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: Markham Street to Mariposa Avenue Length: Approximately 1 mile District: 1 Community: Glen Valley The County of Riverside Transportation Department is proposing to resurface approximately 1 mile of Parsons Road from Markham Street to Mariposa Avenue. Parsons Road is classified as a Local Road in the County of Riverside General Plan. Parsons Road is a two lane road and currently ranges from 22-24 feet wide. The proposed project will include pulverizing the roadway width, including up to 2 feet of the dirt shoulder, and overlaying the pulverized material with Hot Mix Asphalt (HMA). Additional improvements include: Construction of some driveways, some driveway tie-ins, bus turn outs, asphalt concrete dike, and overside drain Placement of safety edge and shoulder backing Utility adjustments Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way or temporary construction easements will be required to construct the proposed improvements. The project improvements will raise the existing roadway profile by 0.30 feet. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
