Partial Parking Lot Replacement - Store 471
Closed · Ontario · Last reported Mar 2025
Source: Dodge
The scope of work requires the supply of construction labour and materials for the partial parking lot replacement of approximately 2,280 sq ft of asphalt, 33 Linear feet of retaining wall and 230 sq ft of concrete ramp for at LCBO Store 471, in Kirkfield, Ontario. as per enclosed drawings and specifications.
- Status
- Closed
- Sector
- Cement, Residential, Car parking, Commercial, Road, Automotive
- Location
- Kirkfield, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Partial Parking Lot Replacement - Store 471
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work requires the supply of construction labour and materials for the partial parking lot replacement of approximately 2,280 sq ft of asphalt, 33 Linear feet of retaining wall and 230 sq ft of concrete ramp for at LCBO Store 471, in Kirkfield, Ontario. as per enclosed drawings and specifications. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Kirkfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Residential, Car parking, Commercial, Road, Automotive |
Article published date | 2025-03-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
- Kearl Ore Preparation Plant
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- McMath Secondary School
