Paschim Shirdi Temple - Germantown, MD
Sector: Water Supply and Storage • Location: Germantown, Maryland, United States of America
Source: Dodge
This is the 1st part of the development. Site development involves grading, stormwater management (SWM), forestation, landscaping, access road, 46 car parking, utilities, site lighting, fire protection, water, and sewer setup before building construction. Public water (1500 feet away) and Sewer (4000 feet away) needs to be completed. Building work The 2nd part of the development would involve the
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Car parking, Waste Processing and Treatment, Automotive, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Biomass
- Location
- Germantown, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Paschim Shirdi Temple - Germantown, MD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is the 1st part of the development. Site development involves grading, stormwater management (SWM), forestation, landscaping, access road, 46 car parking, utilities, site lighting, fire protection, water, and sewer setup before building construction. Public water (1500 feet away) and Sewer (4000 feet away) needs to be completed. Building work The 2nd part of the development would involve the phase 1 building of the development (4,933SF). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Germantown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Waste Processing and Treatment, Automotive, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Biomass |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
