Pasig-Marikina River Basin Flood Management Project
Dropped · Philippines
Source: World Bank Group
The Pasig-Marikina River source is north-east of Metro Manila and the river flows through the city to Laguna de Bay and Manila Bay. The river has limited conveyance capacity and intensive rainfall events during the rainy season from June to November causeregular flooding in the basin. Metro Manila is one of the most densely-populated cities in the world with a population of around15 million and t
- Status
- Failure
- Sector
- Mass Transit, Water Supply and Storage, Road, Waste Processing and Treatment, Hydro, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pasig-Marikina River Basin Flood Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | dropped |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Pasig-Marikina River source is north-east of Metro Manila and the river flows through the city to Laguna de Bay and Manila Bay. The river has limited conveyance capacity and intensive rainfall events during the rainy season from June to November causeregular flooding in the basin. Metro Manila is one of the most densely-populated cities in the world with a population of around15 million and the recurrent flooding has significant impact on millions of people’s lives and the economy. Management of floodswill be critical to improve the quality of life of the 7.5 million people living in the Pasig-Marikina River Basin. Government,through the Department of Public Works and Highways, has invested in river bank strengthening to safely convey rainfall events witha 1:100 year return period, but this infrastructure cannot function optimally until river flow and capacity issues in the uppersection of the river basin have been addressed. These additional interventions will be implemented through the proposed project,including major structural measures (large dam and a retention basin), related smaller structural measures (catchmentrehabilitation, sediment management, and flood forecasting and early warning systems), non-structural measures (inundation mapping,emergency response planning), and support to indigenous people living in the project area. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Water Supply and Storage, Road, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project