Two power plants were developed by YTL Power Generation Bhd. Sdn. that had a combined capacity of 1212-MW, or 808-MW (2x404-MW) at Paka and 404-MW (1x404-MW) at Pasir, respectively. IPP licenses for both plants were granted in April 1993 with construction beginning later that year. The plants went into service in 1994.

The joint venture company, YTL Power Generation Bhd Sdn., was intially own

Status
Prospective
Sector
Cable car, Power Generation (CCGT), Automotive, Commercial, Telecommunications, Government
Location
Johor, Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pasir Gudang Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pasir Gudang Power Plant” is an infrastructure initiative in the Cable car sector, located in Johor, Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two power plants were developed by YTL Power Generation Bhd. Sdn. that had a combined capacity of 1212-MW, or 808-MW (2x404-MW) at Paka and 404-MW (1x404-MW) at Pasir, respectively. IPP licenses for both plants were granted in April 1993 with construction beginning later that year. The plants went into service in 1994. The joint venture company, YTL Power Generation Bhd Sdn., was intially owned by YTL International Sdn Bhd (59.56%), Tenaga Nasional Bhd (4.4%), Employees Provident Fund (EPF)(5.9%), Bara Ak Tif (5.39%), Mayban Ventures Sdn Bhd (2.71%), JL Investment Singapore Private Ltd. (0.59%), a unit of John Laing PLC., and local shareholders (18.72%). The state-controlled Tenaga Nasional Bhd. relinquished its 4.4% stake by selling 71 million shares in December 2003 to YTL Power, and in March 2004 it sold 19.7 million more shares to EPF. Project costs were US$836 million for Paka and US$416 million for Pasir Gudang., or a total cost of M$2.66 billion in local currency. M$1.5 billion was raised via bond subscription with the Employment Provident Fund (EPF) and M$1.16 billion was raised via a syndicated bank loan. A 21-year power-purchase-agreement with Tenaga (TNB) that includes fuel pass through provisions was signed in March 1993. A fuel supply agreement with Petronas was also signed in March 1993. In Feb. 2000, YTL issued US$197.4 million fixed-rate bond (deal led by Deutsche Bank). None None

Original sector

Energy

Budget

Location

Country

Malaysia

State

Johor

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Cable car, Power Generation (CCGT), Automotive, Commercial, Telecommunications, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project