Pasir Gudang Power Plant
Sector: Cable car • Location: Johor, Malaysia
Source: World Bank Group
Two power plants were developed by YTL Power Generation Bhd. Sdn. that had a combined capacity of 1212-MW, or 808-MW (2x404-MW) at Paka and 404-MW (1x404-MW) at Pasir, respectively. IPP licenses for both plants were granted in April 1993 with construction beginning later that year. The plants went into service in 1994.
The joint venture company, YTL Power Generation Bhd Sdn., was intially own
- Status
- Prospective
- Sector
- Cable car, Power Generation (CCGT), Automotive, Commercial, Telecommunications, Government
- Location
- Johor, Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pasir Gudang Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Two power plants were developed by YTL Power Generation Bhd. Sdn. that had a combined capacity of 1212-MW, or 808-MW (2x404-MW) at Paka and 404-MW (1x404-MW) at Pasir, respectively. IPP licenses for both plants were granted in April 1993 with construction beginning later that year. The plants went into service in 1994. The joint venture company, YTL Power Generation Bhd Sdn., was intially owned by YTL International Sdn Bhd (59.56%), Tenaga Nasional Bhd (4.4%), Employees Provident Fund (EPF)(5.9%), Bara Ak Tif (5.39%), Mayban Ventures Sdn Bhd (2.71%), JL Investment Singapore Private Ltd. (0.59%), a unit of John Laing PLC., and local shareholders (18.72%). The state-controlled Tenaga Nasional Bhd. relinquished its 4.4% stake by selling 71 million shares in December 2003 to YTL Power, and in March 2004 it sold 19.7 million more shares to EPF. Project costs were US$836 million for Paka and US$416 million for Pasir Gudang., or a total cost of M$2.66 billion in local currency. M$1.5 billion was raised via bond subscription with the Employment Provident Fund (EPF) and M$1.16 billion was raised via a syndicated bank loan. A 21-year power-purchase-agreement with Tenaga (TNB) that includes fuel pass through provisions was signed in March 1993. A fuel supply agreement with Petronas was also signed in March 1993. In Feb. 2000, YTL issued US$197.4 million fixed-rate bond (deal led by Deutsche Bank). None None |
Original sector | Energy |
Budget |
Location
Country | Malaysia |
State | Johor |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Cable car, Power Generation (CCGT), Automotive, Commercial, Telecommunications, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
