Pasir Panjang Container Terminal Construction Project

Sector: Cement • Location: Singapore

Source: Hyundai Engineering

Project
Closed

The construction of a container terminal at Pasir Panjang (phase 2) is meaningful as it is Hyundai E&C’s first marine infrastructure project to attempt the Caisson Method in Singapore.Caisson refers to a large concrete structure used to build foundations for underwater facilities. The caisson method involves laying the foundation by digging the caisson manufactured on the ground firmly into the su

Project Information FAQ

Project Information

4 Q
The project “Pasir Panjang Container Terminal Construction Project” is an infrastructure initiative in the Cement sector, located in Singapore. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The construction of a container terminal at Pasir Panjang (phase 2) is meaningful as it is Hyundai E&C’s first marine infrastructure project to attempt the Caisson Method in Singapore.Caisson refers to a large concrete structure used to build foundations for underwater facilities. The caisson method involves laying the foundation by digging the caisson manufactured on the ground firmly into the support layer and then filling it with sand, gravel, or concrete to prepare the foundation. Hyundai E&C used a large 88 5,000-ton caisson boxes measuring 30m wide, 16m long, and 19m high in the construction, which involved building a container pier of 2,680m of through 250ha of landfill, 270,000 ㎥ of dredging, and 1.78 million㎥ of ground improvement.Hyundai E&C also applied the Caisson Method to phase 3 and 4 of the Pasir Panjang container terminal construction, which resumed in 2007. Hyundai E&C was awarded the project by the Maritime and Port Authority of Singapore in recognition of its excellent technology, and the company successfully manufactured and installed 150 caisson boxes weighing11,500 tons underwater with zero accident.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data